Concrete for a 20x20 Slab

A 20x20 slab at 4" thick needs
4.94 cu yd

Order 5.43 yd with 10% waste — or 223 × 80 lb bags / 297 × 60 lb bags.

By thickness

ThicknessCubic yards+10% waste80 lb bagsTypical use
4"4.945.43223Patio, shed pad, walkway
5"6.176.79278Light vehicle traffic
6"7.418.15334Driveway, garage

Bags or the truck?

For this 400 sq ft slab at 4": bags ≈ $1,450 (223 × 80 lb — that's 17,840 lb of mixing) vs ready-mix ≈ $840 delivered. The truck wins here. Prices are national ballparks — your local quote rules.

Adjust the numbers

Concrete needed
4.94 cu yd

223 × 80 lb bags | with waste: 5.43 cu yd

Common questions

How much concrete do I need for a 20x20 slab?

A 20x20 slab at the standard 4-inch thickness needs 4.94 cubic yards of concrete — order 5.43 yards with a 10% waste margin. At 6 inches it needs 7.41 yards.

How many bags of concrete for a 20x20 slab?

At 4 inches thick: 223 bags of 80 lb concrete mix or 297 bags of 60 lb. At this volume, delivered ready-mix is usually cheaper and far less work than mixing bags.

Should I use bags or ready-mix for a 20x20 slab?

Ready-mix. Bags for this slab would cost about $1,450 in material and require mixing 17,840 lb by hand; a delivered order runs roughly $840 and arrives ready to pour.

Nearby sizes

16x24 slab4.74 cu yd at 4"18x18 slab4.00 cu yd at 4"16x20 slab3.95 cu yd at 4"20x24 slab5.93 cu yd at 4"